Structural carpentry on a North London apartment block, from the first joist set through to a mansard roof with three built-in dormers cut in place six storeys above the street. An empty shell turned into four luxury apartments.
The brief
The Gladstone House project in North London started in January 2022 with a building that was an empty shell and a brief to turn it into four luxury apartments. On a conversion like that the carpentry is not a finishing trade arriving at the end. It is the first thing on site and it is structural: without floors there is nothing to stand on, and without a roof there is nothing to work under.
The building also happened to be six storeys tall, in a dense part of Tottenham, which changes the job in ways a drawing never shows. Every length of timber has to be got up there. Every cut is made at height. And the roof, when it came, had to be hand cut in place rather than craned in as a made-up structure.
The work ran through 2022 in phases: the first joist and floor set in January, a second joist set in March with the steels infilled, and in September the joist and roof set that finished the building off.
The first task was the joists and floors that would define the four apartments. A team of three completed that set in five days flat, working long days and early mornings to do it. On a conversion the floor set is the gate on everything behind it, so five days rather than two weeks is not a vanity statistic, it is a fortnight handed back to the programme.
The second joist set followed in March. By day three the team had the steel all infilled with hand cut joists on hangers, ready for boarding in 18mm marine ply.
Infilling steel is a different discipline to fitting floor joists in a new build. The steel is set out on site and there is no realistic prospect of every bay being the dimension it was drawn at, so the joists get cut to the opening that is actually there. Hangers then transfer the load into the steel properly instead of relying on timber bearing on a flange. It is slower than dropping in a pre-ordered joist run, and it is the only way of getting a floor that is flat, level and quiet in a building that was not designed around it.
The 18mm marine ply deck is a heavier specification than a standard flooring board. On a project that is going to stand open to the weather for months before it is watertight, that matters: the deck is a working platform for every trade behind you long before it is a floor.
In September 2022 the team completed another large joist and roof set, working six storeys up to hand cut and fit a flat roof, a mansard roof with three built-in dormers, and a parapet wall around the perimeter.
A mansard is the most demanding roof shape in ordinary construction. Two pitches on each side, a steep lower slope and a shallow upper one, means twice the number of critical set-out lines, and every one of them has to be right or the elevation reads as crooked from the street. The three built-in dormers sit within the steep slope, so their cheeks, trimmers and flat tops all have to be framed into a plane that is itself sloping. The parapet wall around the perimeter then hides the junction between the flat roof and the mansard, which is exactly where the water goes, so the falls and the upstands have to be set before the covering trade arrives.
All of it was hand cut in position. At that height and that geometry there is no truss solution: the roof is cut to the building.
On site









The result
By September 2022 the building had gone from an empty shell to a structure: two joist sets in, steels infilled and decked in 18mm marine ply, four luxury apartments defined, and a flat roof, mansard and parapet completed six storeys up with three dormers built in. A satisfying job to work on when it is that size and scale.
For a developer the transferable point is the sequencing. The same carpenters cut the floors in January and the roof in September, so nobody had to re-survey the building for the roof contractor or argue about which trade left a level out. Structural carpentry from the ground floor to the parapet under one contract is faster and it is cleaner, and on a tight London site there is nowhere to hide a mistake.
The Tottenham block sits alongside the Costa, KFC and Taco Bell builds delivered for the same private client, including a Taco Bell in Tottenham itself.
Common questions
A mansard has two pitches on each side, a steep lower slope and a shallow upper slope, which turns what would be roof void into full height habitable space. On a London apartment block that is the difference between a roof and another floor of saleable accommodation, which is why mansards keep being specified on conversions in the capital. The one we built in Tottenham was hand cut in place, six storeys up, with three built-in dormers and a parapet wall around the perimeter.
With hand cut joists and joist hangers. At Tottenham the steels were all infilled with hand cut joists on hangers by day three of that phase, then boarded out in 18mm marine ply. Cutting to the steel rather than ordering to a drawing is the only reliable method on a conversion, because the steel is where it actually is, not where the drawing says it is.
The first joist and floor set at Tottenham, forming the structure for four luxury apartments, was completed by a team of three in five days flat. That was long days and early starts rather than corner cutting, and it is the sort of turnaround that lets a following trade start a week earlier than the programme assumed.
Yes. Daily coverage is Lincolnshire, Cambridgeshire and Norfolk, but contract work has taken the team to London, Kent, Northampton, Nottingham, Leeds, Wales, Hampshire and Scunthorpe. In Tottenham alone we have delivered both this apartment block and a Taco Bell for the same private client.
Related project

British red cedar cladding to Costa's 2022 design at Hemsworth, then a disused Northampton nightclub converted into a KFC and Taco Bell frontage.
Joists, steels, decks, mansards and dormers. Send the drawings and we will price the structural carpentry.