New trussed roof completed on Stoke Ferry Village Hall in Norfolk

Stoke Ferry, Norfolk · Village hall committee

Stoke Ferry Village Hall: a full roof strip back and replace

Roof renovation on a working community building in Stoke Ferry, Norfolk, taken back to the wall plate and rebuilt as a brand new trussed roof. Booked, stripped, replaced and finished inside a fortnight so the hall could carry on being used.

The brief

A village hall that had to stay a village hall

In late May 2025 AJB Group was awarded the opportunity to renovate the local village hall at Stoke Ferry in Norfolk, with a full strip back and replace of the roof. Village halls are not complicated buildings, but they are unusually difficult clients to work for, and for a reason that has nothing to do with carpentry: the hall is booked. Committee meetings, clubs, parties, classes and hire income all sit in a diary that was filled in months before the roof went out to quote.

That is the constraint that shapes the whole job. A roof replacement on an empty building can be sequenced for the convenience of the trades. A roof replacement on a hall in constant use has to be sequenced around the bookings, and it has to leave the building safe, dry and lockable at the end of every single day, not just at the end of the programme.

The second thing that shapes it is that a committee is spending money that the village raised. That tends to mean a tight budget, a short window and a very interested audience. AJB Group works to a standard that keeps opening doors to projects like this one, and building a reputation inside a community is exactly how a carpentry contractor gets asked back.

What we did

Full strip back

The works were a complete strip back and replace rather than a patch or an overlay. Covering, battens, felt and the existing roof structure came off, leaving the walls and the wall plate to work from. Stripping in full is the honest option on a building like this: once the old covering is off you can see what the plate and the wall head are actually doing, and any repair that is needed can be dealt with while there is clear access rather than discovered two winters later.

On an occupied building the strip is the highest risk part of the job. It gets planned so that nothing is opened up that cannot be made safe and weathertight again the same day, with the debris route and the drop zone set out before the first tile is lifted.

A brand new trussed roof

The replacement went back on as a new trussed roof, which is the right call for a hall of this type. A village hall is typically a wide, simple rectangle with no need for habitable roof space, and that is precisely the geometry a trussed roof is designed for. Trusses arrive engineered to the span, they go up quickly, and they get the building back under cover faster than a hand cut roof would on the same footprint. Speed under cover is not a shortcut here, it is the whole point: every extra day the building is open is another day of risk and another day the hall cannot be booked.

The trade-off is that trusses have to be set out, spaced, braced and strapped exactly as designed. A truss is only as good as its bracing, and the temptation on a fast job is to fix them upright and start battening. The bracing pattern is what stops the whole set folding, and it goes in as the trusses go up, not afterwards.

Worked around the timetable

The carpenters worked to get the job done efficiently and to the highest standards while minimising disruption to the hall's busy schedule. That is the sentence a village hall committee actually needs to read before they appoint anybody. Efficiency on this kind of contract is a courtesy, not a boast.

One contractor for the whole roof

Stripping, structure and covering sat with one contractor rather than being split between a roofer and a carpenter. On a small building that split is where the delays come from: the carpenter cannot start until the strip is done, the roofer cannot start until the structure is finished, and each one is waiting on somebody else's programme. Handing the whole roofing carpentry package to one team removes the interface entirely.

At a glance

Location
Stoke Ferry, Norfolk
Client
Stoke Ferry Village Hall committee
Sector
Community and public buildings
Scope
Full strip back and replacement of the hall roof, finished as a brand new trussed roof
Dates
Awarded 29 May 2025, completed roof announced 6 June 2025
Constraint
Hall remained in use, works planned around a busy booking schedule
Status
Complete

Services proven here

Trusses
Roof trusses
Repairs
Roof repairs and alterations
Division
Roofing carpentry
Package
Commercial carpentry

On site

Stoke Ferry Village Hall, Norfolk

New trussed roof completed on Stoke Ferry Village Hall in Norfolk
Roof replacement on Stoke Ferry Village Hall, Norfolk
Roof replacement on Stoke Ferry Village Hall in Norfolk

The result

A safe, dry, welcoming hall for years to come

The team completed a brand new trussed roof on Stoke Ferry Village Hall, and it looks the part. The more important outcome is the boring one: the hall is safe, dry and welcoming again, and it will stay that way for years rather than being nursed through another few winters of repairs.

This was a genuinely important project for the community and AJB Group is proud to have played its part in keeping a local landmark going. Quality workmanship makes a real difference in a village, and it is noticed, which is exactly why work of this kind keeps arriving. Thanks go to the Stoke Ferry Village Hall committee for entrusting the company with a vital upgrade to a building the whole village relies on.

If you are a committee, a trustee or a parish council with a roof that has come to the end of its life, the conversation is worth having early. A strip and replace planned in advance around your diary costs less disruption than an emergency repair booked in the middle of a wet January.

Common questions

About this project

What work did AJB Group carry out at Stoke Ferry Village Hall?

A full strip back and replacement of the roof on the village hall in Stoke Ferry, Norfolk, finished as a brand new trussed roof. We were awarded the renovation in May 2025 and the completed roof was announced in June 2025.

How long did the village hall roof replacement take?

The award was announced on 29 May 2025 and the finished trussed roof was announced on 6 June 2025, so the strip and replace ran to a little over a week on site. Village hall roofs are usually programmed tightly because the building has bookings either side of the works.

Can you re-roof a building that is still in use?

Yes. At Stoke Ferry our carpenters worked to get the job done efficiently and to the highest standards while minimising disruption to the hall's busy schedule. On an occupied building the sequence matters more than the raw speed: you strip only what you can make safe and cover in the same day, and you plan the noisy operations around the bookings.

Do you work on village halls and community buildings in Norfolk?

Yes. Norfolk is one of our three core counties alongside Lincolnshire and Cambridgeshire, and community and public buildings are a regular part of the workload, including Alford Manor House in Lincolnshire and the 16 month renovation of Bourne Town Hall.

Related project

Another civic roof package

Roof works under way at Bourne Town Hall for Probus Construction

Bourne Town Hall

Twelve roof adaptations across eleven roofs on a 16 month civic renovation, plus the steel and timber structure carrying a new five metre clock.

Bourne · Probus Construction

Got a roof that needs stripping and replacing?

Village hall, community building or commercial unit. We will look at it and price the whole roof package.

Call 07716 954091 Get a quote